Streek: Minnesota
Onderwys

St. Thomas's Construction has severely inconvenienced students who live on South Campus and commute

Petisie word gerig aan
University of St. Thomas

178 Handtekeninge

Die petisie het nie die petisie ingedien/afgelewer nie.

178 Handtekeninge

Die petisie het nie die petisie ingedien/afgelewer nie.

  1. Het begin Februarie 2024
  2. Versameling voltooi
  3. Ingedien
  4. Dialoog
  5. Misluk

nuus

2024-02-13 11:19

I have added safety concerns to the reason behind the petition, after it being presented to me as a major issue.


Neue Begründung:

The construction on South Campus has severely inconvenienced the students living on South Campus and those who commute. St. Thomas has taken away over 250 parking spots from commuters without changing the price of parking on campus. The construction has also greatly inconvenienced students who live in Grace Hall or Cretin Hall. The construction is very loud and starts at 7 am every day during the school week. The construction also has made walking to Grace and Cretin Hall very inconvenient to the residents by changing the routes to the buildings without letting the students know. The walking path has now added an extra half-mile for the students to get to class and has made it impossible to bring groceries or anything into the dorms easily. The construction also presents a major safety issue, as there is no accessibility for fire trucks or police officers in case of emergency.



New deadline: 14.05.2024
Signatures at the time of the change: 12


Help om burgerdeelname te versterk. Ons wil u bekommernisse laat hoor terwyl ons onafhanklik bly.

Bevorder nou