34 nënshkrimet
Mbledhja mbaroi
Më shumë për temën Trafik&transport
Trafik&transport
Opposition to the Lake St. Louis Blvd. Extension Project in St. Charles Co. Missouri
472
nënshkrimet
48 ditë
mbetur
It is extremely dangerous trying to merge into my street when most of the traffic ignores the current yield sign. Most of the time, it sends me right back around shirlington circle because its not possible.