Regiji: Marshfield
Varstvo potrošnikov

Stop & Relocate the Marshfield Vermont Cell Tower Project

Peticija je naslovljena na
Verizon Communications

84 Podpisi

Zbiranje končano

84 Podpisi

Zbiranje končano

  1. Začelo november 2024
  2. Zbiranje končano
  3. Pripravite oddajo
  4. Dialog s prejemnikom
  5. Odločitev

novice

24. 11. 2024 10:04

CHANGELOG:
11/24/24 - added one sentence to petition description that acknowledges the need for better cell coverage in our area.


New petition description:

Petition to RelocateRELOCATE Proposed Cell Tower in Marshfield:

We,We acknowledge and understand the need for better cell coverage in our town and surrounding towns - particularly in our village and towns to the north and east of Marshfield (Cabot, Danville, Peacham, Groton, etc).

However, we, the undersigned, stand united in our opposition to Verizon's proposal to construct a 140-foot cell tower at 2264 U.S. Route 2. This tower threatens to disrupt our landscape and poses health risks, as it lies within a 0.3-mile radius of our village's densest population.

Research indicates increased health risks, including cancer, including increased harm to children, and harm to pets, livestock, and local wildlife. Additionally, the tower's visibility could reduce property values and be significantly injurious to the natural aesthetic beauty of Marshfield, especially our village center. Verizon must find alternative locations that are greater than 3.5 miles from the village center.

Join us in protecting the health, safety, and beauty of our town by signing this petition to demand the relocation of the proposed cell tower.



New deadline: 07.01.2025
Signatures at the time of the change: 38


Pomagajte okrepiti sodelovanje državljanov. Želimo, da bi bili vaši pomisleki slišani in hkrati ostali neodvisni.

Promovirajte zdaj