Regione: DeSoto
Edilizia

Say "No!" to Lithium-ion Energy Storage Facility in DeSoto, TX

La petizione va a
DeSoto Planning and Zoning and city Council members

505 Firme

Raccolta voti terminata

505 Firme

Raccolta voti terminata

  1. Iniziato giugno 2024
  2. Raccolta voti terminata
  3. Preparare la presentazione
  4. Dialogo con il destinatario
  5. Decisione

La petizione è indirizzata a: DeSoto Planning and Zoning and city Council members

Emerald Hill Energy Storage and Vesper are proposing a 250 megawatt lithium-ion energy storage facility be placed on the south west corner of Eagle Dr. and Westmoreland in DeSoto, TX.

Lithium storage facilities should NOT be housed in residential areas! These facilities are prone to fires and explosions with toxic plumes, detrimental to humans/pets, as well as environmental and personal economic concerns.

The proposed site is yards from DeSoto High School, and at least 3 neighborhoods share boundaries with the proposed site. The proposal would house 100 lithium-ion battery containers in the residential area!

The latest battery energy storage system (BESS) fire ignited at the Otay Mesa Gateway Energy Storage in San Diego on 5/15/24, burned for five days—the city was fully evacuated--after two weeks the fire was still smoldering.

Emerald Hill’s website and mailings suggest there is an established partnership with the City of DeSoto, but it is misleading—they have not filed the required materials with the city.

Please join us in saying, "NO!" to Emerald Hill's and Vesper's proposal to erect a BESS in DeSoto, TX by signing this petition!

Motivazioni:

The residents of DeSoto would like to preserve and protect our children, quality of life, property values, and the city's economic and residential growth. Having a battery energy storage system placed in a residential area will adversely effect all of these areas.

Grazie per il tuo supporto, Tracy Nelson , De Soto Parish
Domande ai promotori

Condividi la petizione

Immagine con codice QR

Slip a strappo con codice QR

download (PDF)

Dati della petizione

Avviata la petizione: 20/06/2024
La raccolta termina: 22/12/2024
Regione: DeSoto
Categorie: Edilizia

Novità

Non è ancora un argomento PRO.

I am opposed to this Lithium Battery storage facility coming into this city, in which I have resided since 1986. This will be environmental hazardous to our residents, school, and overtime succumb to having health issues from the toxic games of this "Lithium Battery storage facility. I am saying "NO" Mr. Dan Kirk

Contribuisci a rafforzare la partecipazione civica. Vogliamo che le tue istanze siano ascoltate e allo stesso tempo rimanere indipendenti.

Promuovi ora