Changes to the petition 08/01/2024, 11:57 The collection target number needs to be changed to reflect those residents closest to the site. New deadline: 22.12.2024Signatures at the time of the change: 421
More on the topic Construction Lewis County Construction A petition against WSDOT roundabout in Morton Wa highway 12 16 % 78 Signatures 172 days remaining Arizona Construction Stop the development of Paloma Estates on corner of Tuthill & Elliot Road! 5 % 47 Signatures 155 days remaining West Windsor Township Construction Roads, Infrastructure 2 % 10 Signatures 97 days remaining