Changes to the petition 08/01/2024, 11:57 The collection target number needs to be changed to reflect those residents closest to the site. New deadline: 22.12.2024Signatures at the time of the change: 421
More on the topic Construction Clermont Construction Stop further expansion of the ISLAMIC CENTER OF CLERMONT through Rezoning 100 % 1,593 Signatures 142 days remaining Kyle Construction Protect Kyle Vista Park 24 % 119 Signatures 45 days remaining Lewis County Construction A petition against WSDOT roundabout in Morton Wa highway 12 22 % 109 Signatures 31 days remaining