Environment

Spring Creek parcel change could have large impact on current residents

Petition is addressed to
Elko County Planning and Zoning Committee and Elko County Commissioners

388 signatures

1,000 for collection target

388 signatures

1,000 for collection target
  1. Launched September 2024
  2. Time remaining > 8 weeks
  3. Submission
  4. Dialog with recipient
  5. Decision

I agree that my data will be stored . I decide who can see my support. I can revoke this consent at any time .

 

Petition is addressed to: Elko County Planning and Zoning Committee and Elko County Commissioners

Soil and water are a huge concern for the residents with this potential change.
Signees in this petition wish to express strong opposition to application 24-2000-0011, Modern Land and Development, LLC, requesting a zoning change from Open Space District (OS) to an Agricultural-
Recreational District (A), for 160-acre parcel and a 741.32-acre parcel owned by Ruby Mountain Ranch
Holdings, LLC, adjacent to the Spring Creek Association, Palace Heights. Application 24-2000-0011, Modern Land and Development, LLC

Reason

Why are we against it?

  1. The landowner and developer are requesting the zoning change to create 5 acre lots in this combined area of 901-acres, adjacent to Spring Creek Association, Palace Heights.
  2. Access to the new subdivision would likely be through the Spring Creek Association via Palace Parkway.
  3. While this parcel may be private land, it is also a key headwater to Butterfield Creek, and remaining winter habitat for Mule Deer in a key travel corridor. Allowing the zoning change for future development would not only change the aesthetics, quiet, and dark space of the community but also displace the wildlife that currently calls it home.

More details to consider:

  1. Water!
  2. 80 5-acre parcels would require 360 ac-ft of water to be secured (2 acre-feet/new parcel)
  3. (roughly another 120 million gallons of water)
  4. Combined with the mountain parcel also up for re-zoning, a total of 1097 acre-feet of water tied up for houses, that will no longer be available for ag, wildlife, or mining purpose.
  5. Will impact 5 small cul-de-sac roads (Black oak, Cripple Creek, Wolf Creek, Eagle Creek & Sumac Dr.), along with significantly increasing traffic on Palace Parkway. Who will pay the additional maintenance costs?
  6. Soils for these two parcels are rated as “very limited” for Septic Systems noting slow water movement, seepage in bottom layer, and depth to cement pan. These very limited soils could lead to system failures with impacts to both ground and surface waters.
  7. Soils for these two parcels are rated as “very limited” to “limited” for road development due to dust, frost heave, shrink and swell, causing negative effects for air quality and maintenance issues into the future.

For more information contact: springcreekopenspaceadvocates@gmail.com

Thank you for your time and support!

Thank you for your support, Spring Creek Open Space Advocates from Spring Creek
Question to the initiator

Share petition

Image with QR code

Tear-off stub with QR code

download (PDF)

Petition details

Petition started: 09/16/2024
Petition ends: 03/19/2025
Region: Elko County
Topic: Environment

Translate this petition now

new language version

News

The road infrastructure is already burdened with traffic, there isn't enough water to support the project and its expensive enough already, this project will only benefit a handful of individuals who are already greedy! Do not commercialize the Ruby Mountains with a ski resort.

No CONTRA argument yet.

Why people sign

We don’t have enough water as it is out here. If I wanted to live in a community that is over populated I would move to the city. I like it out here just the way it is. Please no more homes.

I live in Spring Creek. I live here for the wide open spaces and silence and peace

Developing would have a negative impact

This area already has water challenges.

More chemtrails is not an option to create more moisture
I would move if this area is developed

Tools for the spreading of the petition.

You have your own website, a blog or an entire web portal? Become an advocate and multiplier for this petition. We have the banners, widgets and API (interface) to integrate on your pages. To the tools

Translate this petition now

new language version

Help us to strengthen citizen participation. We want to support your petition to get the attention it deserves while remaining an independent platform.

Donate now