49 서명
청원서는 다음 주소로 보내집니다. All those directly impacted
WE, THE UNDERSIGNED RESIDENTS, respectfully petition the Oconee County Council and Seneca City Council to:
1. Enact a Temporary Moratorium: Immediately suspend approvals for new residential and commercial developments in Seneca until Garrison Farms, Cascade Point, and Seneca Falls are fully built out and occupied.
2. Conduct a Comprehensive Impact Assessment: Commission a publicly accessible study within [e.g., 90 days] evaluating:
• Traffic impacts on Rochester Highway, Wells Highway, and Joe Lewis Road. he Oconee County Planning Commission is tasked with ensuring sustainable growth, which includes traffic considerations, but without completed developments, any studies would rely on projections that may underestimate real-world pressures. Residents have raised concerns about traffic congestion, particularly during school hours, yet no specific pre-session or peak-hour studies are documented to address these issues for the current projects. This suggests a need for delaying new approvals, such as Carver Park, until existing developments are built out and comprehensive traffic impact assessments can be conducted under operational conditions.
• Emergency services capacity (fire, police, EMS) for new residents.
• School capacity at Seneca High School, Seneca Middle School, and elementary schools, including student-to-teacher ratios and facility needs.
• Sewer system capacity at the Coneross Creek Water Reclamation Facility, with measures to prevent repeats of the 2019, 2020, and May 20, 2025, sewage spills and address chronic sewer smells, as discussed at the May 21, 2025, OJRSA meeting.
• Wildlife displacement, particularly black bears, coyotes, owls, herds of deer, raccoons, skunks, possums, and large flocks of birds, with mitigation plans to protect habitats and reduce human-wildlife conflicts.
• Flooding risks along Coneross Creek, incorporating data from 2019, 2020, and 2025 events, with mitigation strategies to protect infrastructure and ecosystems.
• Environmental impacts on Lake Keowee, including runoff, erosion, and pollution risks from development, with measures to protect water quality and aquatic life.
• Economic sustainability, including employment opportunities and demand for new housing, to ensure developments align with Seneca’s workforce and population needs.
3. Verify Market and Infrastructure Readiness: Require data-driven evidence that the housing market can absorb new units without depressing property values, that sufficient employment opportunities exist to support new residents, and that infrastructure, schools, sewer systems, flood defenses, and Lake Keowee’s ecosystem are adequate before approving new projects.
4. Hold a Public Hearing: Schedule a public hearing within [e.g., 30 days] to address resident concerns, including sewer smells, flooding, Lake Keowee impacts, and housing market oversaturation, present assessment progress, and discuss the moratorium.
This petition reflects our commitment to responsible growth, ensuring that Seneca’s infrastructure, schools, sewer systems, economic stability, and natural environment—including Coneross Creek, Lake Keowee, and wildlife - can support current and future residents without compromising safety, education, or ecological health in the face of frequent flooding, chronic sewer issues, and insufficient employment. We urge the Councils to act promptly to protect our community.
Signed,
이유
This petition reflects the residents rights to responsible growth, ensuring that Seneca’s infrastructure, schools, sewer systems, economic stability, and natural environment—including Coneross Creek, Lake Keowee, and wildlife - can support current and future residents without compromising safety, education, or ecological health in the face of frequent flooding, chronic sewer issues, and insufficient employment. We urge the Councils to act promptly to protect our community.
지금 이 청원을 번역하세요
새로운 언어 버전사람들이 서명하는 이유
Our infrastructure cannot handle another housing development. We are already being asked to not use electricity 3 hours a day, in order to conserve. Enough is enough!
The increased traffic and demands on our city/county services is too high. Over time, our beautiful and moderate community will turn into a congested, over burdened city. If you want evidence of the future, look at the traffic congestion, crime increase, and failing services of Swuanee, GA!
We already have 3 incomplete housing developments in a very small area off of Wells Hwy; a 4th is not necessary. What brought us to the area is slowly slipping away.
This development will only have a negative impact on the area and will not be recoverable if approved. Numerous and rationale information and data was presented at the initial city council meeting. It would do all well to review it and heed the warnings of such a huge project.
청원서 배포를 위한 도구.
당신은 자신의 웹사이트, 블로그 또는 전체 웹 포털을 가지고 있습니까? 이 청원을 옹호하고 확산시켜 주세요. 우리는 귀하의 페이지에 통합할 수 있는 배너, 위젯 및 API(인터페이스)를 갖추고 있습니다. 도구로
This petition raises very good points and only theoretical answers are available to address these at this time so I very highly agree that waiting until there is concrete data to see the actual impacts and how it will really effect those of us who have always lived in this community and want to see the community thrive not get trampled.