Tell City Leadership That You Are Concerned About Data Centers!

Petition is addressed to
Mayor of Fort Wayne, Indiana Sharon Tucker

511 Signatures

100 %
500 for collection target

511 Signatures

100 %
500 for collection target
  1. Launched January 2026
  2. Time remaining > 2 months
  3. Submission
  4. Dialog with recipient
  5. Decision
personal data
 

I agree that my data may be stored. I can revoke this consent at any time.

Petition addressed to: Mayor of Fort Wayne, Indiana Sharon Tucker

Living just a few miles from the Google data center in Fort Wayne, Indiana, I am deeply concerned. Not only for my own well-being, but also for the safety and quality of life of my neighbors, friends, family, and the entire community of Fort Wayne, New Haven, Allen County, and unincorporated Allen County.

Many of us have built our lives and futures here, establishing deep roots with an expectation of safety and a high quality of life. We are invested in and paying attention to projects that could potentially bring great harm to all of our lives, and the Google data center, already under construction in Fort Wayne, Indiana, poses significant risks to our financial security, energy grid stability, access to safe and clean drinking water, public health and safety, our environment and wildlife, privacy and data surveillance, and more.

Recently, it has been implied that concerns about data centers come from a small but loud group of people who do not represent the concerns of the average resident. We want to let our city leadership know that our concerns are held by a large and growing number of people – please sign and share this petition so we can show our representatives that our concerns are not small and that we are a people who will fight for our lives and demand better from those we have placed in positions of power.

Reason

Data centers pose a threat to our access to safe, clean drinking water—a basic human right. As of 2025, nearly 30 million Americans were living in areas with high levels of water limitation. Lack of safe and clean water has lead to dehydration and hunger, economic stress, sanitation issues and disease, wildlife and biodiversity loss, conflict, and more. According to calculations based on Google's own 2025 Environmental Report, the Fort Wayne data center could withdraw 720 million gallons of potable (drinking) water annually.

Data centers can also compromise our ability to breathe air unpolluted by diesel exhaust pumped from industrial diesel-fueled generators. A research paper found that since 2023, the increase in permits for diesel generators at data centers in Virginia has been linked to 14,000 asthma symptom cases and caused as much as $300 million in health care costs. The American Lung Association found that in 2025, Hoosiers are breathing some of the most polluted air in the country.

In a recent study, Bloomberg found that electricity costs as much as 267% more than it did five years ago in areas located near data center activity. Harvard recently published a study titled, “Extracting Profits from the Public: How Utility Ratepayers Are Paying for Big Tech’s Power.” Some Fort Wayne residents have reported increases in their utility bills, ranging from 20% to 100%.

According to The Guardian, a report from the International Energy Agency (IEA) states that global energy demands from AI data centers could quadruple by 2030. Existing energy grids are being overwhelmed by data centers’ energy demands and this can result in blackouts, disruption to essential and emergency services, and catastrophic system failures resulting in mass casualties.

The financial burden on our communities also cannot be overlooked. Property values could decline due to risks associated with living near such facilities, such as noise pollution, light pollution, smell and smog from the industrial diesel-fueled generators, impacts on local schools and quality of education, and more. The infrastructure updates necessary to support data centers' massive energy consumption can lead to increased local taxes and utility bills, as additional resources will be required to support the data center’s operation.

It is crucial for our local elected officials to understand the breadth and depth of our concerns. They need to recognize that the alleged benefits do not outweigh the threats to our quality of life and lives themselves. We demand that our voices to be heard. We demand to be involved in the decision-making process from here on out, since we were deliberately kept uninformed when the project was first being introduced to our city officials.

In 2023, several groups and elected bodies were a part of bringing Google and its nearly 900-acre data center campus to our community. City Council voted to award Google tax abatements that will cause the city to lose $55.5 million dollars in tax revenue, and they also allowed Google to begin operations in our city without implementing a Community Benefits Agreement or any protections for the people and families that work and live in our communities.

Join me in standing up for Fort Wayne, New Haven, Allen County, and unincorporated Allen County residents — sign this petition to show our local government officials that there is a substantial amount of concern that deserves respect and attention. We must take immediate actions that prioritize the health, safety, and prosperity of our communities over unregulated corporate exploitation. Our concerns must be taken seriously, and our city's leadership must rise to the occasion and do all within their power to protect us.

Learn more: https://fwdatacenteraction.wordpress.com/

Petition details

Petition started: 01/22/2026
Collection ends: 07/21/2026
Region: Fort Wayne
Topic: Consumer protection

Translate this petition now

new language version

News

  • Hello supporters,

    We are urgently seeking individuals who live in direct proximity to the Fort Wayne Google data center campus who 1. are living with a respiratory illness, cardiovascular disease, or asthma and/or 2. have someone living in the home with a respiratory illness, cardiovascular disease, or asthma and/or 3. have someone who regularly visits their home that has a respiratory illness, cardiovascular disease, or asthma.

    We are asking these individuals to please write a letter of appeal to the Indiana Department of Environmental Management, describing how this decision will directly impact your health or the health of a loved one in your home. Please email your letter along with your first and last name, phone number, and home address to danielledoepke@proton.me — letters must be sent to Danielle Doepke by Monday, April 27th.

    In order to file an appeal against IDEM's decision regarding the 179 diesel-fueled industrial generators and one million gallons of diesel fuel stored on Google's Fort Wayne data center campus, we need to have standing and letters from directly impacted community members. Your letter will act as the appeal and our group will file on your behalf — there is no financial risk or risk of filing an appeal.

    Once again, letters must be sent to Danielle Doepke — danielledoepke@proton.me — by Monday, April 27th.

    Thank you for your continued support,

  • On Thursday, April 30th at 5:00pm IDEM will be holding a virtual Public Hearing regarding Google's Phase III data center expansion requests. The expansion of the existing Google data center campus involvings three additional buildings, associated utility infrastructure, internal drives, and stormwater facilities. This is Phase III of a multi-phase, multi-year project.

    According to reporting from 21Alive News, “We’re talking more than 867,000 square feet total. If all three buildings were the same size, they would each be the size of a large IKEA store just like the one down in Fishers.”

    To make room for the buildings, Google intends to destroy and permanently impact waterways like Adams and Doctor Ditch as well as long-standing, naturally occurring, biodiverse forested wetlands.

    Attend the Virtual Public Hearing and Email the IDEM Waterways Office to Tell Them to Not Approve Google's Phase III Request WQC001454 — do not allow Google to continue to destroy and permanently impact our waterways and wetlands

    Hearing Notice: https://www.in.gov/idem/public-notices/public-notices-northeast-indiana/#allen. (Project Zodiac Data Center – Phase 3)

    Virtual Meeting: https://tinyurl.com/IDEM-Public-Hearing-April30
    Meeting ID: 295 254 793 692 59
    Passcode: EP9vD7vh

    Dial In by Phone: 1 (317) 552-1674
    Phone Conference ID: 935 626 883#

    Submit Written Comment:
    Email: WaterwaysComments@idem.IN.gov
    Subject: Public Comment Regarding #WQC001454; I wish to receive a copy of IDEM’s final decision

    FastAction link with pre-written comment, just add your information: https://secure.ngpvan.com/YdvEugbG6U2q6gFAUkhJEA2

  • ​*** FOR IMMEDIATE RELEASE ***
    OFFICIAL STATEMENT IN RESPONSE TO IDEM’S APPROVAL OF GOOGLE’S AIR PERMITS

    On behalf of all who have been fighting against this decision for many months, we are disgusted and furious that IDEM has come to this conclusion — government institutions are meant to protect the people, not the interests of corporations. 

    The fate of innocent people and families, human beings who simply have the misfortune of building their lives next to what was once agricultural land, are at risk. The workers currently onsite during this multi-year construction project, as well as any future in-person employees will also be deeply affected by this decision. While our children, the elderly, the disabled; the immunocompromised; people with asthma, respiratory illness, cardiovascular disease, and COPD are most at risk for adverse health impacts, make no mistake – this is violence against all forms of life.
    Premature death is a proven consequence of exposure to diesel exhaust air pollution – this has been well documented by international and national scientific research institutions. Despite this, Google has made the conscious decision to ignore the human health impact and utilize diesel-fueled generators as an energy source. 

    Google continues to claim that their generators will be emergency use only and because of this, none of diesel-fueled generators on site – current or approved in this decision – require any pollution or emissions controls. Absolutely none. Google voluntarily agreed to not exceed a limit of 250 tons/year of NOx (nitrogen oxides) pollution, however, basic calculations show that the generators easily exceed those limits well within the 100 hours of time they have been allowed to operate by the EPA.

    In the people’s appeals to IDEM, we demanded that Google be held to the highest standards and utilize the best available technologies. Research has shown that Tier 4F generators reduce harmful exhaust and soot emissions by 90% — this technology exists and would significantly reduce the potential harm. However, IDEM has chosen not to hold Google to the highest possible standards and so far Google, one of the top global megacorporations whose value currently sits at $3.8 trillion dollars, refuses to install the best available technology and retrofit their equipment with pollution controls. Instead, the diesel exhaust smoke and soot is free to permeate our air and coat our lungs. The people of Allen County should be outraged.

    IDEM has failed to prevent Google from destroying and permanently altering our wetlands and waterways; now they are allowing Google to pollute our air. Our federal and state leaders and lawmakers have failed to install legislative protections against this kind of deceptive corporate exploitation. Mayor Sharon Tucker, Greater Fort Wayne Inc., the Fort Wayne Economic Development Commission, the Fort Wayne Redevelopment Commission, County Commissioners, City Council, and other local bodies and individuals have failed to protect the residents of Allen County through their refusal to demand better from Google.

    Do not let them forget what they have done to us and what they have stolen from us. It is critical to continue using your power to vote and protest – we must put the right people in positions of power. Support candidates that champion people over profits, will demand legislative oversight, and will work to end the reign of corporations and special interest groups. We all deserve representatives who will fight for us, and we cannot stop fighting for a better future.

    Sign the petition and share your thoughts with Mayor Sharon Tucker: www.openpetition.org/protectallencounty

    Signed,
    Concerned Residents with Protect Allen County, Liveable Fort Wayne, and Fort Wayne Data Center Action

    Find us & resources at: www.fwdatacenteraction.wordpress.com

Why people sign

I don’t think we need it.

Environmental impact not discussed with public before approval. Continued changes to plans. Worry about impact on wetlands, plus the air quality already ruined by approval of generators, not to mention noise. How about ecological study of area before approval to note wildlife counts and type so you know what is affected. How about a detail report of impact on water shed disruption.

I feel that it was a mistake from the beginning. Public was not aware of far reaching consequences to our air quality, grid and water and the entire environment. Asking for an extra 140 diesel emergency generators, AND HAVING IT GRANTED, showed me only the citizens care. There were other generator options, but at a higher cost. These will lower the air quality as far as Pennsylvania.

The water and electricity consumption are outrageous!

I stand with the people who have some valid objection. So many times, the decision to move forward with a plan has already been made by the powers that be (city) before people are able to voice their concerns, Who will actually benefit from this project and who will suffer? I expect there are many more reasons for objection than there are for benefit. I just see taxes and utility rates rising! Overall, this sounds like a waste of money for power hungry controllers.

Tools for the spreading of the petition.

You have your own website, a blog or an entire web portal? Become an advocate and multiplier for this petition. We have the banners, widgets and API (interface) to integrate on your pages. To the tools

Translate this petition now

new language version

Help us to strengthen citizen participation. We want to support your petition to get the attention it deserves while remaining an independent platform.

Donate now